Atenvia — Product Roadmap
Version: 1.0 · Status: Living · Last updated: 2026-06-16 · Owner: TAS Team Derived from: Master PRD
⚠️ Read first
- Today's product is a 100% mock-data prototype with NO backend. The shipped clinical app is real and demoable; everything else on this roadmap is blocked on building a backend. See Master PRD → Critical Context.
- Horizon model is Now / Next / Later — not a calendar. Order reflects dependencies, not committed dates.
- Effort sizes (S/M/L/XL) are rough T-shirt estimates and ASSUMPTIONS, not validated plans. The source PRDs contain no estimates except the Admin Dashboard's "~3–5 dev-days." Treat every size below as a starting point to refine, not a commitment.
Effort legend (assumption)
| Size | Rough meaning |
|---|---|
| S | ~days |
| M | ~1–2 weeks |
| L | ~3–6 weeks |
| XL | ~1.5–3 months (multi-workstream) |
The one thing that gates everything: the backend
The single most important fact on this roadmap: almost
nothing planned can ship without a backend (server, database,
auth, and an ETL/data-handler). Today all data is hard-coded in
src/data/mockData.ts. Until the backend exists:
- Real authentication and RBAC are impossible (role gating is visual-only).
- Real patient/device data cannot enter the system (no ingestion).
- Nothing persists across refresh.
So the roadmap front-loads the backend foundation. Work that does not need it (UI polish, the already-built Admin Dashboard's mock behaviour) can proceed in parallel.
🟢 NOW — Foundations & the gated surface
Goal: stand up the backend spine and unlock the work that everything else depends on.
| Initiative | Why now | Depends on | Effort (assumption) |
|---|---|---|---|
| Backend & persistence ADR | Decides auth provider + data store (e.g. Firebase Auth + Firestore vs. dedicated API). Gates all downstream work. | — | S |
| Backend foundation (server, database, hosting, staging) | The universal prerequisite. No real data, auth, or persistence without it. | ADR | XL |
| ETL / Data Handler service (skeleton) | The engine that will process all inbound integration data; needed
before any vendor/CRM sync. scripts/prismacloud/ is the
seed. |
Backend | L |
| Authentication (sign-in, session, sign-out) | Replaces the demo password gate; prerequisite for RBAC. | Backend | M |
| RBAC + patient scoping | Four access tiers + row-level patient scoping, server-enforced. Core safety/compliance requirement for real PHI. | Auth, data-model migration | L |
| Re-enable Admin Dashboard behind TAS-Admin tier | The six panels are already built and commented out
in App.tsx — re-home them behind real RBAC. |
RBAC | S |
| Super Admin surface | Distinct governance surface for IT/Digital Transformation + Digital Product. | RBAC | M |
| Engage CyberSafe + secure grant (pen-test & compliance scoping) | No code dependency — procurement/planning can start immediately and in parallel. Locks in grant funding and the pen-test/audit scope early. | — | S (consultant-led) |
Exit criteria for NOW: a real authenticated user with a verified role lands on the correct tier-appropriate surface; out-of-scope access is denied server-side and audited; the Admin Panel is reachable only by TAS Admin / Super Admin.
🟡 NEXT — Real data flows in
Goal: replace synthetic data with live device + CRM data through the data handler.
| Initiative | Why next | Depends on | Effort (assumption) |
|---|---|---|---|
| Device cloud ingestion — first vendor | Prove the ETL pattern end-to-end on one cloud (likely the largest installed base). | Backend, ETL skeleton | L |
| Device cloud ingestion — remaining 3 vendors (CloudPAT · NeXus360 · PrismaCloud · AirView) | Complete CPAP + HST coverage across Itamar/ZOLL, Compumedics, Löwenstein, ResMed. | First vendor pattern | L each (XL total) |
| ZohoCRM patient-stage sync (webhook or API) | Patient stages/demographics flow from TAS's system of record; powers pipeline + KPIs from real data. | Backend, ETL skeleton | M |
| System Health panel — multi-vendor + CRM | Per-source sync status, ETL run history, freshness badges
(generalise from single prismacloud source). |
Ingestion live | S |
| Retire mock generators | Swap generate*.ts for ingested data as the source of
truth for clinical tabs. |
Ingestion live | M |
| Penetration testing (CyberSafe, grant-supported) | First external security test once there is a real auth + RBAC + data system to attack. Validates server-side enforcement and PHI scoping. Findings feed a remediation cycle. | Backend, Auth, RBAC live | M (consultant-led + dev remediation) |
Exit criteria for NEXT: clinical tabs (CPAP Report, Sleep Report) and the pipeline render real device + CRM data; System Health reflects live sync state for all four vendor clouds and ZohoCRM.
🔵 LATER — Hardening & scale
Goal: enterprise-readiness, deeper admin tooling, and organisational maturity.
| Initiative | Depends on | Effort (assumption) |
|---|---|---|
| Admin enhancements — audit export (CSV/PDF), bulk clinician invite, per-user feature flags, virtualised audit tables, threshold preview ("X patients would trigger") | Admin Panel live | L |
Dedicated TAS admins — split tas_admin
out from Super Admin in practice |
RBAC | S |
| MFA | Auth | M |
| SSO / hospital identity federation (SAML) | Auth | L |
Care-team / multi-owner patient ownership (beyond
single assignedClinicianId) |
RBAC data model | M |
| Bi-directional ZohoCRM sync (write-back of compliance/alerts) — if scoped | ZohoCRM inbound sync | M |
| Per-sub-role tightening for TAS Internal Ops (if business later requires) | RBAC | S |
| HIPAA compliance audit | RBAC + audit logging + PHI controls live; pen-test remediation done | L (auditor-led) |
| SOC 2 audit (Type I → Type II) | Security controls + monitoring in place; pen-test remediation done. Type II requires an observation window (typically 3–12 months). | XL (auditor-led, time-gated) |
🔐 Security & Compliance (cross-cutting)
Security and compliance are not a single milestone — they thread across all three horizons, but the formal certifications come last because they attest to controls that must already exist.
| Item | Horizon | Led by | Notes |
|---|---|---|---|
| Engage CyberSafe + secure grant funding | NOW | TAS + CyberSafe | Start immediately; no code dependency. Locks scope + funding early. |
| Penetration testing | NEXT | CyberSafe (grant-supported) | Needs a real auth + RBAC + data system to test. Findings → remediation cycle. |
| HIPAA compliance audit | LATER | External auditor | Attests PHI controls (access, audit logging, minimum-necessary scoping per the RBAC PRD). |
| SOC 2 audit (Type I → II) | LATER | External auditor | Type I = controls designed; Type II = controls operating over a 3–12 month window. |
Sequencing logic:
- Pen test gates the audits. Run penetration testing (and remediate findings) before the formal HIPAA / SOC 2 audits — auditors expect a tested, hardened system.
- Readiness is built in earlier. The controls these audits check (server-side RBAC, PHI scoping, audit logging, Clarity masking) are already specified in the RBAC work (NOW), so much of HIPAA/SOC 2 readiness accrues during build — the LATER items are the formal attestation, not net-new control work.
- CyberSafe + grant make pen testing materially cheaper; confirm what the grant covers (pen test only, or audit-readiness consulting too) during the NOW engagement.
⚠️ Effort sizes for compliance items are consultant/auditor-led, not dev T-shirt sizes — they depend on CyberSafe / the chosen auditor's process and (for SOC 2 Type II) a fixed observation window. Treat them as calendar-gated, not effort-gated.
Dependency spine (at a glance)
graph TD
ADR[Backend ADR] --> BE[Backend foundation]
BE --> ETL[ETL / Data Handler]
BE --> AUTH[Authentication]
%% Data track
ETL --> DEV[Device cloud ingestion ×4]
ETL --> ZOHO[ZohoCRM sync]
%% Access track
AUTH --> RBAC[RBAC + patient scoping]
RBAC --> ADMIN[Admin Panel re-enable]
RBAC --> SUPER[Super Admin surface]
RBAC --> HARD[MFA / SSO / dedicated TAS admins / care-team]
ADMIN --> ENH[Admin enhancements]
%% Security and compliance track
RBAC --> PEN[Penetration test — CyberSafe, grant-supported]
DEV --> PEN
ZOHO --> PEN
PEN --> COMP[HIPAA + SOC 2 audits]
%% Already shipped, off the critical path
UI[Clinical UI — already shipped]
classDef crit fill:#7c2d12,stroke:#f97316,color:#ffffff;
classDef done fill:#14532d,stroke:#22c55e,color:#ffffff;
classDef sec fill:#1e3a8a,stroke:#60a5fa,color:#ffffff;
class ADR,BE,AUTH,RBAC,ADMIN crit;
class UI done;
class PEN,COMP sec;Critical path (highlighted above):
ADR → Backend → Auth → RBAC → Admin Panel. In
parallel off the backend (data track):
ETL → ingestion (device clouds + ZohoCRM). The clinical UI
is already shipped and is not on the
critical path.
Plain-text fallback (if Mermaid does not render):
- Foundation: Backend ADR → Backend foundation
- Data track (off backend): ETL / Data Handler → Device cloud ingestion (×4) · ZohoCRM sync
- Access track (off backend): Authentication → RBAC + scoping → Admin Panel re-enable → Admin enhancements; RBAC also → Super Admin surface · MFA / SSO / dedicated TAS admins / care-team
- Independent: Clinical UI (already shipped — not on critical path)
What this roadmap is NOT (gaps to close)
- Not dated. No committed timeline — sizes are assumptions (see legend). Convert to a calendar only after effort validation with the build team.
- Not resourced. Assumes capacity is decided separately; XL items imply multiple workstreams.
- Not a substitute for the ADRs. Backend/auth choice (§Backend ADR) and the integration mechanism (ZohoCRM webhook vs. API; device sync cadence) must be settled before their dependent items can be sized accurately.
- Open items still open. See Master PRD §7 — audit-export status, existence-leak rule (403 vs 404), TAS-admin appointment, ownership granularity, ZohoCRM field set.
Living document. Re-sequence as dependencies resolve and replace assumption-sizes with validated estimates. Source of truth for scope remains the Master PRD.