TAS Portal
Release tracker · updated 20 November 2026

Snoraire launch tracker

Open Snoraire’s post-launch 90-day plan

Beta · 73%16.5 of 22.5 weighted points18 of 26 items done · Beta checklist
Full launch · 50%16.5 of 33 weighted points18 of 37 items done, including beta · Public launch checklist

Full launch includes beta and 11 public-launch items. Testing items earn half a point. Formal security sign-off, staffed support coverage and the public launch decision are production requirements. The name approval is complete, and the full device matrix runs during the employee beta wave.

18Done
11In progress
8To do

Beta next steps

  1. Confirm tester access

    Build 21 is assigned to Snoraire Internal, which has zero testers. The Android internal-test route worked on the Pixel. Use Internal TestFlight for eligible App Store Connect users or External TestFlight once Apple clears it. Employees without App Store Connect access need the External TestFlight route.

    Shane
  2. Record send or hold for the employee wave

    Record send or hold by platform once the exact signed build is available to eligible testers and Marketing has approved the distribution list. The Digital Product Team sends approved invitations.

    Digital Product Team, Marketing
  3. Verify the builds during beta

    Android build 14 passed its initial Pixel smoke test. Collect iPhone verification and remaining Android device evidence during the wave. Record each exact build and store route.

    Shane, Jonas
  4. Run the full overnight matrix during the employee wave

    Record device-by-device results on the signed beta builds. Use the results and supported-device limits for the public production review.

    Shane, Jonas, testers

Brand and identity 5 of 5 done

  • DoneBetaSetup
    Choose the name and secure snoraire.com

    Domain ownership is confirmed and the site runs on it.

    Checked live 18 Nov
  • DoneBetaSetup
    Create the new Apple and Google Play app records

    Both exist under the new Snoraire app identity. The older Airese records are untouched.

    ShaneRecorded 17 Nov
  • DoneBetaSetup
    Set up signing and store upload access

    Working for both platforms. Both builds below were signed and accepted.

    ShaneRecorded 17 Nov
  • DoneBetaBuild
    Include Snoraire branding in the beta builds

    The new signed pair includes the final report wording. Check the installed experience on signed builds during beta.

    Shane, JonasRecorded 19 Nov
  • DoneBetaApproval
    Approve the Snoraire name for use

    The project owner confirmed approval to use Snoraire on 20 November.

    Project ownerDecision record

Website 4 of 4 done

  • DoneBetaRelease
    Publish the site on snoraire.com

    Live, with the www address redirecting to it.

    ShaneChecked live 18 Nov
  • DoneBetaRelease
    Publish privacy, terms and medical disclaimer pages

    All three are live. The privacy policy includes the usage analytics section. An update saying analytics is off until the tester opts in, with no screen recording, is in review as website PR #5.

    ShaneChecked live 18 Nov
  • DoneBetaBuild
    Show beta download options

    The site is in beta mode, with the Android internal test link and iPhone guidance.

    ShaneChecked live 18 Nov
  • DoneBetaRelease
    Publish the beta campaign handoff

    The live beta buttons use the staging handoff. A synthetic test verified the campaign values. Verify the tagged campaign on installed apps during beta.

    ShaneChecked live 19 Nov

App builds and testers 4 of 7 done

Beta Store Evidence has the store worksheets, reviewer instructions and dated receipts.

  • DoneBetaRelease
    Upload the iPhone build, 0.1.14 (21)

    Apple processed the signed replacement and lists it in Snoraire Internal and Snoraire External (Beta). External review and eligible installation are tracked below.

  • DoneBetaRelease
    Upload the Android build, 0.1.14 (14)

    Play Console shows version code 14 active. A physical Pixel installed build 14 through Play internal testing.

    ShanePlay Console readback 20 Nov
  • DoneBetaSetup
    Match the app and website environments

    Both signed beta builds point to the staging API used by the beta website.

    Shane, ProductRecorded 19 Nov
  • DoneBetaBuild
    Build and sign the staging pair

    Both archives passed artifact inspection with their staging configuration and separate beta update channel.

    Shane, JonasRecorded 19 Nov
  • In progressBetaBuild
    Verify the signed replacement pair with opt-in analytics

    Android smoke passed. A Pixel 7 Pro verified signup, analytics off by default and explicit opt-in, microphone recovery and short recording. Collect iPhone build 21, replay and overnight evidence during beta.

  • In progressBetaSetup
    Confirm eligible testers on both platforms

    Google Play lists DPT and Testers. The Pixel installed build 14 through Play internal testing. Confirm store access for eligible testers, including the private iPhone invitation route when Apple clears External TestFlight.

    ShaneStore console readback · 20 Nov
  • In progressBetaApproval
    Make the selected build available in External TestFlight

    Waiting for Review. App Store Connect shows build 21 in the external beta group. The build can be offered to external testers after Apple approves it. Record the eligible employee install during the beta.

Tracking and CRM 3 of 5 done

  • DoneBetaRelease
    Deploy the tracking API to staging

    Deployment and its authenticated smoke test passed.

    ShaneRecorded 18 Nov
  • DoneBetaTesting
    Test the campaign handoff on both platforms

    Synthetic handoffs returned all four campaign values from staging.

    ShaneRecorded 18 Nov
  • DoneBetaTesting
    Write test leads to the Zoho sandbox

    Synthetic Singapore and Malaysia leads were written and read back. The signed Android build has since delivered a callback to each regional sandbox.

    ShaneRecorded 18 Nov
  • In progressBetaTesting
    Run the full journey on a real phone

    Both regional callbacks were confirmed in the signed Android app, returned HTTP 201 from staging and created matching Zoho sandbox leads. Singapore and Malaysia meet the beta care handoff criterion. The iPhone and tagged campaign checks remain open.

    Shane, JonasPixel 7 Pro, AWS and Zoho readback · 20 Nov
  • In progressBetaTesting
    Confirm the matching PostHog event

    PostHog recorded the Pixel callback start and success with the same request reference. AWS and Zoho independently confirmed delivery. The server-side PostHog acceptance event still needs verification.

    ShanePostHog, AWS and Zoho checked · 20 Nov

Beta tests and employee wave decision 2 of 5 done

  • DoneBetaSetup
    Complete the four preparation gates

    Build checks, access and staging readback passed for the candidate assessed on 8 Nov. The new builds still need the remaining gates.

    ShaneLast assessed 8 Nov
  • In progressBetaTesting
    Rehearse migration and recovery

    CI migration and drift checks and a staging smoke test passed. Run a restore and rollback rehearsal using agreed recovery targets and record the outcome.

    Shane, backup operatorCI and EAS-104/105 checked 19 Nov
  • In progressBetaTesting
    Pass overnight testing on real phones

    The device matrix and harness work have started. Run the full overnight matrix on builds 21 and 14 during the approved employee wave and retain results and failures for the production review.

    Shane, Jonas, testersDevice matrix checked 19 Nov
  • DoneBetaTesting
    Verify the Singapore and Malaysia care path

    For beta, a matching lead visible in the regional Zoho CRM counts as care-team pickup. Signed Android build 14 produced a matching lead in each regional Zoho sandbox. Both employee-beta routing checks passed.

    Product, care owners, ShaneSG and MY signed-device callback readback · 20 Nov · EAS-87
  • To doBetaOperations
    Record the employee beta send-or-hold decision

    Record send or hold by platform when the exact signed build is available to eligible testers and the distribution list is approved. DPT sends approved invitations. The full overnight matrix runs during the wave.

    Digital Product TeamEAS-65

Full launch workstreams Proposal for review

Agree the launch markets, platforms, owners and date in EAS-93. Mid-January is a working target. The tracker schedules go/no-go for 8–12 February.

  • Launch scope

    Confirm Singapore and Malaysia, platforms and rollout order. Agree what February needs to deliver, including grant-acceptance evidence if applicable.

    Product, Easmed management
  • Content calendar

    Align pre-launch education, launch-day announcements and week-one follow-up by market, channel, owner and approval date. Publish install calls to action once the matching store links work.

    Marketing
  • Operating process

    Staff support and regional care queues. Rehearse a Zoho callback through human follow-up, incident escalation, rollback and pause communications. Name a primary and backup.

    Shane, SG/MY care leads
  • Suggested features

    Use employee beta evidence to rank a two-night comparison and improvements to the existing reminder. Commit a feature only after confirming the user need, capacity and release scope.

    Product, Design
  • Bug fixes and device checks

    Rank launch blockers across signup, overnight capture and recovery, reports and callbacks. Retest fixes on signed builds and record supported physical devices and any approved exceptions.

    Jonas, Shane
  • Claims, privacy and security

    Review the exact launch claims, consent, privacy and deletion flows. Obtain production security sign-off for the candidate and rehearse recovery before go/no-go.

    Product, clinical and privacy reviewers, Shane
  • Public store release

    Submit the production listings, screenshots, disclosures and signed builds to Apple App Store and Google Play. After approval and go/no-go, verify eligible installs in each launch market before website and campaign cutover.

    Shane, Marketing
  • Launch monitoring

    Check production attribution, signup, usable nights, reports, repeat nights and care handoff. Review the first 24 hours and seven days against agreed thresholds and record whether to continue, pause or roll back.

    Product, Engineering, Marketing, care leads

Public launch checklist 0 of 11 done

  • In progressFull launchTesting
    Confirm website analytics in Fathom

    The live website bundle contains the Fathom configuration. A pageview receipt in the Marketing dashboard is still needed.

    Shane, MarketingWebsite checked 19 Nov
  • In progressFull launchBuild
    Add the public website access request form

    The landing-page form is in draft PR #4. Confirm the public intake route and verify receipt before using it. The employee beta uses its own opt-in form.

    ShanePR checked 19 Nov
  • In progressFull launchApproval
    Approve public legal, support and deletion routes

    Privacy, Terms and Contact are live. The /delete-account URL returned 404. Confirm the approved deletion method, support routing and legal versions.

    Marketing, privacy, ProductWebsite and EAS-53 checked 19 Nov
  • To doFull launchSetup
    Complete Google Play app setup

    Finish the public app setup and verify it in Play Console. Google allows internal testing before this setup is complete.

    ShanePlay guidance checked 19 Nov
  • To doFull launchRelease
    Enable tracking on the production API

    Staging deployment and smoke passed. Enable and verify the matching public attribution API before connecting the website.

    ShaneStaging evidence checked 19 Nov
  • To doFull launchApproval
    Approve store listings and disclosures

    Draft copy exists. Verify the final screenshots, claims and privacy disclosures against the public candidate and record approval.

    Marketing, privacy, ProductEAS-56 and EAS-75 checked 19 Nov
  • In progressFull launchApproval
    Complete formal production security sign-off

    Approve the exact production release line, including credentials, endpoints, least privilege, storage and logging, Terraform-state secret disposition and signed-device integrity.

    Shane, security approverEAS-58
  • To doFull launchOperations
    Record the full production go/no-go

    Review the completed employee-wave device matrix, supported-device limits, recovery and rollback evidence, a monitored support route, named primary and backup, response targets, escalation, pause authority and communications, and regional care readiness. Record the release approver’s decision before public distribution.

    Release approverEAS-113
  • To doFull launchRelease
    Release on the App Store and Google Play

    The public iOS and Google Play listing checks returned 404. Confirm a live listing and eligible install in the approved launch markets.

    Shane, release approverPublic links checked 19 Nov
  • To doFull launchRelease
    Connect the website to production

    The live website still uses the staging handoff. The public attribution API URL and Apple campaign token are blank in the served configuration.

    ShaneWebsite configuration checked 19 Nov
  • To doFull launchRelease
    Switch the website to public mode

    The served website configuration is in beta mode. Enable public badges and remove the management review notes after public distribution checks pass.

    ShaneWebsite configuration checked 19 Nov

“Checked live” means we tested the public site or store link on that date. “Apple readback” and “Expo readback” report each provider’s result. The unfinished items were rechecked on 19 November against the ticket tracker, live website, provider receipts and project evidence.

Earlier launch reviews and decisions
Release notice

Earlier beta checkpoint · 8 November 2026

Beta invitations remain on hold. The builds named here are superseded; see the Snoraire tracker above. Read the store evidence →

Checkpoint details and evidence limits

Beta invitations remain on hold. Android 0.1.10/26 was submitted to Play internal; iPhone 0.1.10/32 is valid and in internal TestFlight testing. Play track availability, approved tester access and physical installation still need verification.

Four preparation gates are complete. Store distribution is partial; security, migration and recovery, installed-candidate and overnight testing, SG/MY care and CRM, legal and support material, and final operations approval remain unfinished. Shane owns deployment and DevSecOps; Jonas supports application and build defects.

Review the beta store evidence · Read the seven-gate closure plan, owners and evidence

Checkpoint version: 2026-11-08-beta-release-preflight-v5. The release tracker above shows the 19 November builds and the remaining acceptance checks.

Decision notice

Current decisions · reconciled 11 November 2026

Password sign-in, the provisional formula, Night Notes and the bedtime reminder are approved product choices. Review decisions →

Decision details and evidence limits

Password sign-in, the provisional snore formula, Night Notes and the bedtime reminder are approved product choices, confirmed by Shane on 2 November. Jonas continues formula testing and tuning. Score categories, callback contracts, regional CRM details and legal/operational approval retain their open decisions and acceptance requirements.

Beta invitations remain on hold. The last release checkpoint, 8 November v5, records four preparation gates complete and seven unfinished gates. Android 0.1.10/26 and iPhone 0.1.10/32 were submitted; tester access, installed-device and overnight acceptance remain unverified.

Read the reconciled decision log · Review the dated beta store evidence · Download the focused workbook · 22 records · Full register · 30 records

Version 2026-11-11-decision-checkpoint-v1. The Notion decision timeline was updated and read back on 11 November; broader ticket acceptance synchronization is not claimed. Earlier conflicting text is historical. This is a reconciliation of saved evidence, not a fresh provider check or release approval.

Historical launch baseline · 23 October 2026 · v5

October launch review

26 October scope update · email OTP accounts

The meeting decision supersedes the accountless product boundary in the 23 October audit below. Server-sync proof, legal/privacy, thresholds and Wednesday screen sign-off remain open. Reconcile the 11 November target with proposed mid-November feature lock; existing device gates remain unchanged. Read current decisions · 2026-10-26-signoff-v1. Earlier store/provider findings keep their original dates.

Three pieces of work can start today: the store package, the legal and data inventory, and the regional care handoff. None of them waits on open product decisions. Final store claims, privacy declarations and release sign-off come later, once the behaviour is agreed and a signed build exists.

We are not ready to release yet.

We have access to both store consoles, but the listings are incomplete and several product decisions and release concerns are still open. Completed evidence is kept below with its dates. The 11 November closed beta and the tentative mid-January public launch are still planning targets, not commitments.

27 October 2026 · 2026-10-27-meeting-v1

Launch planning and marketing alignment

The latest meeting adds detail to the launch plan. The product baseline remains email OTP. Formula, category, retention and release decisions still need approval. Earlier dated sections below are historical where this update identifies a conflict.

Wednesday 28 October: settle the product flow

Kedar will turn the full report wizard into a flowchart. Shane and Jonas will then identify what belongs in Phase 1 and later delivery. We need to agree widgets, the score formula, Ordinary/Unusual/Repeated Patterns, CTA triggers and wording, deletion and callback confirmation. Night comparisons and pause-count work remain deferred.

Thursday 29 October: agree the regional care handoff

The recorded direction is direct submission to Zoho by API, with form fields used as reference. We need to reconcile Singapore SCC pickup with the earlier SG CS route, confirm Malaysia CCC pickup, and agree the Singapore payment and booking sequence. Exact endpoints, permitted fields, staffing, fallback and response time remain open. Neither 24 hours nor three days is approved.

Shane, Jonas and Daniel coordinate the handoff discussion. Jonas is assigned to coordinate Malaysia access with Wei Jian. Access, destination receipt and human response each need evidence. Symptoms and sleep data mentioned in the notes are not an approved CRM payload.

Marketing and distribution

Daniel leads the recorded marketing track. Daniel and Maha will consolidate feedback for Kedar: mobile sign-up above the fold, shorter landing-page copy, drop-off analytics and store copy/design. Daniel will organize the proposed weekly TAS marketing execution meeting. Landing-page internal testing is targeted for the week of 2 November; completion has not been verified.

Product-side UTM attribution is assigned to Shane in the summary. We need to confirm the implementation owner against the PM-only role agreement. Paid channels and KOC content were discussed; no spend approval is recorded.

Dates and scope to confirm

  • Mid-November private/internal beta, December teasers and January/February public launch are planning direction. Reconcile the 11 November invitation target with the proposed mid-November feature lock.
  • The summary calls 50–100 users a minimum. Confirm the first batch and maximum against the earlier cohort range. Beta includes real Zoho care pickup, alongside app and algorithm checks.
  • Email OTP remains baseline. December/January SMS wording does not expressly replace the January deferral.
  • Local-audio/remote-analysis wording describes intent. Confirm actual processing transfers, retention, deletion and any separate research path before changing privacy notices.

Source: 27 October Granola meeting notes. The connector returned an AI-generated summary; full transcript access is unavailable. These notes establish no new clinical, legal, device or release acceptance. Screenshot requirements, regional clinical pathways and the broad IMDA deadline window require separate verification.

The Phase 1 PRD decision map (23 October) ties each open rule to its screens, tickets and evidence. Launch concerns C01–C19 below remain the shared release list.

Start now

These are suggested next steps. They do not create new assignments or deadlines; owners and dates stay as they are.

WorkUseful output nowWhat needs agreement
Store package
Maha · existing end-of-October target
Draft the store copy, icon/feature-graphic brief and screenshot storyboard using the current UI and synthetic data.Final score/claims, regional availability, support identity and candidate UI before approving screenshots or publishing copy.
Product decision review
Product + Engineering; relevant approvers
Work through C01–C19 below and the wider release workstreams. Record each agreed rule, approver and impact on Kedar's screens and copy.Start with score/report rules, data identity, legal acceptance and retention. Technical proposals need the relevant product, clinical or legal approval.
Privacy and legal preparation
Product + Engineering + legal/privacy approver
Inventory the data, purpose, destinations, identifiers, retention and deletion for production, staging, research and analytics. Prepare document/declaration drafts from that inventory.Confirm the controlling entity and approver. Finalise accessible documents, consent versions and audit evidence before collection or store declarations.
SG/MY care and support
Existing regional Sales/CCC, IT and Marketing owners
Collect the approved Zoho form, regional contacts/store list, support inbox owner and campaign-link taxonomy. Draft the callback and escalation process.Agree recipient, minimal payload, consent, response expectations and regional selection. Location detection and editable content infrastructure still need scope and estimates.
Release preparation
Existing release and engineering owners
Complete review/integration, prepare signed candidates and schedule device evidence. Assemble review instructions and tester lists.Do not submit or invite participants until the applicable legal, product, store and operational checks have evidence and named approval.

Verified store gaps

Read-only console inspection on 23 October, using Comet's f. profile. This supersedes the earlier access-blocked notes. No store settings were changed.

Apple App Store

Airese production · iOS 1.0 · Prepare for Submission

  • The Account Holder must accept the updated developer agreement before submission.
  • The inspected English (U.K.) iPhone screenshot slot contains 0 screenshots.
  • Description, keywords, support URL, copyright and reviewer contact/notes are blank.
  • No build is selected for this version.
  • Privacy Policy URL is unset; App Privacy declarations show Get Started.

Open production version ↗

Google Play

Airese · com.tas.airese · Draft · Production inactive

  • TAS DPT organisation access works. Initial setup is 0 of 11 complete.
  • Short and full descriptions are blank; the app name is already Airese.
  • Icon, feature graphic and phone screenshots are empty.
  • The console requests a 512 × 512 icon, 1024 × 500 feature graphic and 2–8 phone screenshots.
  • Internal testing is 2 of 3 tasks complete; tester selection remains open.

Open production dashboard ↗

Other device/localisation slots, pricing/countries, detailed policy answers and TestFlight processing were not fully audited. Uploaded binaries, completed setup tasks and physical acceptance are separate evidence.

Settle the data boundary before final copy

The V1 scope note records an accountless app with recordings/history on the phone, intended production database submissions and research uploads to R2. Server-held sensitive health data requires an agreed authentication, ownership and access-control design. We need to reconcile the exact payload, identity, access protection, acceptance audit and erasure design before implementing that boundary.

“Nothing leaves your phone” is not approved copy.

Production submissions, research uploads and analytics need their own accurate descriptions. Consumer login and backend authentication are different design choices; this page does not approve either a return to accounts or an authentication bypass.

The same-day compliance source review records placeholder legal text/consent versions and unresolved analytics notice/choice. Draft PR #37 is an implementation plan, not completed remediation or legal approval. The 120 MB/night estimate, fixed 10 pm reminder, eight-hour cap and battery observations below are supplied inputs, not fresh device measurements.

27 October · evidence and release ownership

Version 2026-10-27-completeness-v1. 26 October evening source; PRD approval record. Earlier observations below retain their dates and limits.

Shane coordinates PM and the decision pack; Jonas owns engineering under the recorded internal operating model. Maha’s launch assets and FAQ, and Shahira’s historical care-SOP assignment, need confirmed dates and acceptance receipts. The internal note reports Ervin as final product authority; formal delegation and separate operational, legal/privacy, release and pause authority still need confirmation.

Required recordEvidence to attachCurrent limit
Candidate and test resultsSigned build/configuration, supported device/OS, observed result and receipt for each required scenario, including unchanged EAS-26/27 overnight acceptance.The new two-round plan is Not run. Meeting notes add no physical-device pass.
Unresolved defectsCandidate/device, severity and user/data impact, owner, fix/retest receipt or authorized exception with expiry.A complete current-candidate defect inventory was not retrieved.
Release dependenciesApproved scope/rules, legal documents, store package, SG/MY receipt, phones, capacity and agreed sequence.Reconcile the 11 November invitation target, proposed mid-November lock and earlier conditional 6 November go/no-go.
Support and recoveryMonitored address, primary/backup, country/timezone hours, response expectation, triage/fallback, recovery operator/checkpoint and acceptance receipt.Historical prototype hours and API recovery do not establish current staffing or complete recovery acceptance.
Go/no-goNamed product/domain/release authorities, exact candidate and evidence reviewed, decision/date, conditions and invitation limit.No go decision is recorded by this update.

Preparation can continue against the decision and test pack. These local additions are unpublished; the Notion checklist/timeline changes are pending access. Existing ticket properties and generated snapshots remain unchanged.

Shared release concerns

The product decisions are part of a wider release review across Product, Engineering, Design, Marketing, Legal/Privacy, IT and regional care. This workstream view overlaps the detailed decisions; it is not an additional issue count.

WorkstreamStatusCurrent concern
Store package and submissionOpenStore access is available. Screenshots, copy, declarations, reviewer details and candidate selection remain incomplete in the inspected listings.
Legal documents and consentOpenThe source review records placeholder legal content and consent versions. Final documents, acceptance evidence and approval remain required.
Analytics notice and controlsOpenThe source review did not establish a usable analytics choice/withdrawal control. Confirm the actual payloads and approved notice/data boundary.
Retention, withdrawal and erasurePartial foundationLocal erasure and a research erasure queue exist. A complete retention policy and reliable end-to-end deletion evidence, including analytics and backups, remain open.
Claims and research participationOpenScoring/interpretation, permitted claims, research information, responsible contacts and the applicable approval evidence need agreement.
Signed candidates and device acceptancePartial evidenceHost checks and an older staging Android UI smoke passed. Current signed Android/iOS recording, overnight resilience, supported-device coverage, replay and export evidence remain open.
Regional care and supportOpenConfirm SG/MY callback destination, CRM routing, permitted payload, support identity, FAQ, response ownership and escalation.
Commercial and launch scopeOpenConfirm free/paid scope, countries, languages, iPad support, beta recruitment and the treatment of the historical day-8 deletion proposal.
Release operations and approvalOpenComplete review/integration, candidate-specific acceptance, tester access, monitoring/triage and named go/no-go. The Apple Account Holder agreement action remains outstanding.

Evidence already completed

Completed checks remain visible with their dates and limits. They do not automatically close the related release workstream.

EvidenceDateWhat was completedEvidence limit
Store-console access23 OctoberCompany access to both stores verified in Comet f.; production app records identified.Access is complete for this inspection; listing/submission readiness is still open.
Production infrastructure checks19–20 OctoberRecorded API readiness/authentication smoke, image/configuration recovery and clean post-restore Terraform plan.Historical infrastructure evidence, not acceptance of the latest mobile candidate or database-write rollback.
Storage and email probes19 OctoberSynthetic production storage put/get/delete and cleanup passed; inbox delivery was confirmed by the operator.Does not settle the final support identity, data retention or application recording/upload acceptance.
Release tooling and host validation22–23 October recordThe integrated stack records 12 repository checks, five builds, 26 JavaScript harness checks and three audio-tool checks passing.Host validation and tooling preparation do not establish physical-device acceptance.
Physical staging UI smoke22 OctoberAn exact-source staging APK passed sign-in/signup/legal navigation on a Samsung SM-A356E running Android 16.Older account-based staging source; no current local-first recording, export or physical iOS acceptance is implied.

Read the dated decision timeline for how the account, verification, Night Notes and callback discussions changed. The timeline is a notes-based draft, not an approval record.

Product and release decisions

These shared decisions remain open. Engineering confirms technical behavior and feasibility; Product and the relevant clinical, privacy, legal, Marketing and care owners approve their decisions. Design and copy depend on the agreed rules. These entries do not change ticket status or approved scope.

C01 · Snore Score formulation Open decision

Agree the formula, inputs, denominator, weighting and version. Record clinical/evidence limits; an implemented or researched formula does not establish product approval.

C02 · Metric bands Open decision

Define what low, moderate, often and severe mean for every applicable metric, including boundary values, units and user-facing wording.

C03 · Comparison across nights Open decision

Agree the reference average/window, minimum eligible nights, exclusions and comparable recording conditions. Specify when frequency and loudness comparisons can be shown, and the exact copy.

C04 · Night report categories Open decision

Define Ordinary, Unusual and Repeated Patterns, the conditions for each and whether the patterns are confirmed. Agree insufficient-evidence and fallback copy.

C05 · Unsuitable recordings Open decision

Agree thresholds that make a recording unsuitable for analysis and what the user sees. Keep invalid/insufficient evidence distinct from a reassuring low score.

C06 · Multiple sessions per day Open decision

Agree day/night grouping, timezone/cross-midnight treatment, aggregation versus separate sessions and their effects on trends and comparisons. Kedar needs the display rules.

C07 · Repeat sign-in and server data Open decision

Resolve the identity conflict above; define repeat sign-in/session behavior, ownership and access protection if sensitive health data is persisted remotely. Authentication and access protection must be specified in that case. Kedar and copywriters need the confirmed data boundary.

C08 · Recording prevention and reminders Open decision

Agree the minimum acceptable free storage and hard prevention/stop behavior, including copy and recovery. The supplied consideration is that charging state may be detected but battery level should not be assumed available; confirm this on supported platforms before promising a battery-level rule.

C09 · Recording retention and pruning Open decision

Agree how long original audio is kept, the pruning trigger/order and what reports remain after audio removal. The supplied estimate is approximately 120 MB per eight-hour night; this is a planning estimate, not a measured release budget. Kedar needs the pruned-night state.

C10 · Bedtime reminders Open decision

Decide whether reminders are customisable and specify time, timezone, opt-in and rescheduling behavior. The current reminder is reported as fixed at 10 pm; this observation has not been re-tested here.

C11 · Eight-hour stop and sleep chart Open decision

Resolve the reported eight-hour recording cap against charts that imply users can record more than eight hours or meet a longer “healthy” range. Distinguish recording duration from measured sleep; agree the cap, graph and copy together.

C12 · Terms, Privacy and acceptance audit Open decision

Approve both documents with PostHog and actual data flows included. Decide account-linked versus accountless acceptance in line with C07; define document versions, acceptance timestamps, audit evidence and reacceptance. Engineering needs the confirmed model before designing acceptance storage.

C13 · Research participation Open decision

Prepare separate research terms/consent for uploads, including externally referred participants. Agree recruitment eligibility, recipients, purpose, withdrawal and acceptance evidence before sending research builds outside the team.

C14 · Erasure Open decision

Agree local/server/research data deletion and retention obligations from the approved Terms and Privacy Policy, including what happens to retained reports, consent audit evidence and backups. Implementation follows the approved policy.

C15 · Callback payload and destination Open decision

Confirm what is sent to regional Sales/CCC, the approved Zoho form URL, consent and minimum necessary fields. Keep health data out of the handoff unless explicitly approved.

C16 · Regional CRM workflow Open decision

Agree SG/MY routing, ownership, acknowledgement/retry, callback response expectations, escalation and closure/booking reconciliation.

C17 · Marketing UTM tracking Open decision

Agree the campaign links, parameter taxonomy, attribution rules and consent/data boundary across store/install/app/callback. Confirm the owners and evidence needed for the full journey.

C18 · Support identity Open decision

Choose the monitored support address and domain: Snoraire versus The Air Station. Confirm inbox owner, backup and where the address appears in-app, in legal documents and in store listings.

C19 · SG/MY contacts and store locations Open decision

Approve the contact/location inventory, regional selection rule and whether device location is actually required. Editable database-backed content is proposed that can be updated/synced without an app release; confirm editor ownership, freshness/fallback, privacy/permissions and engineering scope/time before commitment.

Then approve the release package

  1. Record decisions with approvers, versions and affected screens/tickets.
  2. Finalise legal documents, declarations, copy, screenshots and regional/support details against the candidate.
  3. Attach the exact build, complete review information and tester setup, and retain signed-device evidence.
  4. Obtain the named product, operational and release go/no-go before submission, invitations or public rollout.

Sources and update boundary

Notion launch checklist · V1 build/data boundary · Draft privacy/consent plan.

This is a dated editorial launch review. The delivery tracker continues to use its established one-way Notion snapshot; this page does not update ticket counts, statuses or owners. Changes to approved requirements need explicit ticket/document reconciliation.

Local counterparts: airese-beta-decisions-2026-10-08.md and the production release preparation/handoff documents, shared 23 October version v5; store evidence remains the dated v3 inspection. No formula, threshold, legal position or launch commitment is approved here.

Internal working material · TAS Portal · Snoraire tracker updated 19 November 2026 · Earlier launch baseline last reviewed 23 October 2026