TAS Portal
Snoraire & Atenvia · reconciled 11 November 2026

All documents in one place.

Notion and Figma links require an Easmed login.

Snoraire recording engineering handoff — capture, analysis, proposed results saving and acceptance checks. Updated 2 November 2026.

Snoraire FAQ for CCC / SCC — the app experience, report limits and care-team readiness. Engineering FAQ.

Portal glossary — care, product, privacy and engineering terms.

Privacy and PII research · 3 November — official Singapore/Malaysia sources, practical findings and outstanding approvals.

Current decisions and release evidence

Decision log · 19 November — dated Snoraire and Atenvia decisions with transcript sources.

Launch Tracker has the current release status. Beta Store Evidence has submission worksheets and dated receipts. Canonical release checklist.

Owner confirmations · 2 November v3 — password sign-in, approved provisional formula, Night Notes and bedtime reminder; original approval-date limits retained.

Analytics implementation checkpoint · 6 November — draft PR #43 and the remaining integration, provider and device evidence. Provider and PR status have not been refreshed in this reconciliation.

Downloads

DocumentWhat it isFormat
Snoraire running-cost workbook · 18 November v4AWS spending, monthly forecasts, concurrent-user performance costs and a plain-English service guide.Excel
Snoraire running-cost report · 16 NovemberFour-page costing report and six-month budget.PDF
Snoraire decision log · 19 NovemberProduct and engineering decisions, with current transcript findings and retained history.Excel
Scope and delivery workbookShane’s dated work, status and reasons for Snoraire and Atenvia, with a glossary. October 2026.Excel
October 2026 report (draft)Monthly management report, interim draft.PDF
October 2026 one-pager (draft)One-page summary of the October report.PDF
September 2026 reportMonthly management report.PDF
August 2026 reportMonthly management report.PDF
Beta delivery plan · 22 SeptemberEarlier team discussion deck. The PRD and decision history show current direction.PDF
Decision registerFull audit register with 30 decision records, approval provenance, open dependencies and sources. The Excel download is the focused 22-record view.CSV
Original Snoraire PRD · June 2026Gabriel’s first product requirements, for reference.PDF

Portal pages

These open in your browser. Use your browser’s Print → Save as PDF to keep a copy.

DocumentWhat it isFormat
Snoraire PRD overviewCurrent beta scope and decisions, with links to the detailed requirements.Web page
Snoraire product analytics dashboardLive beta and QA usage, recording outcomes and product signals in the protected preview.Web page
Snoraire hypotheses and behaviour analyticsProposed PostHog tracking and native heatmap pilot, with completed local checks and open device acceptance.Web page
Snoraire costsDaily Easmed AWS billing, service breakdown and six-month forecasts for three user scenarios.Web page
Snoraire cloud server designHow the app’s server works, what is running today, and what is left to do. Plain-language.Web page
MVP decision pack · 28 OctoberDated decision-review pack with options and recommendations. Open items are not approved sign-off.Web page
Snore score optionsHistorical formula comparisons and simulator. The approved provisional baseline and remaining validation are recorded in the decision log.Web page
Data and server specHow accounts, recordings and results are stored.Web page
Deleted recording behaviourWhat the app shows after a user deletes a recording.Web page
Release test planTest rounds and pass/fail rules for the release.Web page
Privacy notice (draft)Draft for legal review.Web page
Terms of use (draft)Draft for legal review.Web page
Design sourcesWhich screens and designs the decisions are based on.Web page
Decision historyEvery product decision, with its date and source.Web page
Launch trackerProgress and next actions for beta and full launch.Web page
Beta Store EvidenceSubmission worksheets, reviewer instructions and dated store receipts.Web page
Regional launch report · 16 OctoberSingapore and Malaysia launch readiness.Web page
Product and delivery evidenceProduct baselines, launch phases and handover records for IMDA.Web page
Delivery trackerProgress, owners and blockers from Notion.Web page
Atenvia discovery and specAtenvia discovery, kickoff plan and first product proposal.Web page
Journey and historyThe path from screening to care, and how the products got here.Web page
Original Snoraire PRD (web)Gabriel’s June 2026 PRD, readable online.Web page

Notion

DocumentWhat it isFormat
Product WikiHome for Snoraire and Atenvia product work and tasks.Notion ↗
Snoraire launch checklistApp Store and Google Play launch checklist.Notion ↗
Decision timelineProduct decisions as recorded in Notion.Notion ↗
Patient journey mapSleep apnea journey from diagnosis to treatment, with Snoraire touchpoints.Notion ↗
Atenvia product homeAtenvia product workspace.Notion ↗

Design (Figma)

DocumentWhat it isFormat
Snoraire web prototypeKedar’s clickable prototype of the app. No login needed.Web ↗
Snoraire app screensThe current Snoraire screen designs (High Fidelity V.03).Figma ↗
Snoraire user flowApp structure and user flows.Figma ↗
Snoraire design systemColours, type and components.Figma ↗
Snoraire value propositionThe original business case slides.Figma ↗
Competitive analysisSnoreLab, Sleep Cycle and other sleep apps compared.Figma ↗
Atenvia app screensAtenvia doctor portal designs (v0.1).Figma ↗
Atenvia design systemColours, type and components.Figma ↗
Atenvia lifecycle protocolThe patient lifecycle Atenvia supports.Figma ↗