TAS Portal decision timeline
Easmed decision review · 19 November 2026
Version 2026-11-19-easmed-transcript-review-v1. Coverage is 29 October–19 November inclusive. The 27–28 October records remain background. Meeting directions, conditional targets and implementation evidence carry their own dates.
Snoraire (Airese)
- 3 November · Results layout selected for beta (D-25). The Ervin review selected Option 5: balanced side-by-side cards, a prominent verdict and care CTA, and extra emphasis on Listen only when breathing-pause signals are frequent. This supersedes the 2 November unequal-card proposal. Exact styling, trigger cutoffs, signed-device acceptance and final screen/copy sign-off remain open. 3 November Teams transcript · EAS-130 · EAS-88.
- 2–3 November · Callback context and routing (D-06, D-14, D-15, D-26, D-27). The 2 November morning proposal used one triggering night. Later that day, the care review chose up to three latest available nights regardless of severity for beta, with one night sufficient to request care. A deliberate repeat request would replace the CRM description, restart the three-day clock and enter the queue in submission order. Duplicate network retries are governed by the separate idempotency contract. On 3 November the engineering direction was server-side filtering and separate Singapore and Malaysia Zoho Leads destinations. The 4 November phone-required direction still needs field and enforcement confirmation. The 18 November synthetic regional sandbox writes verified isolated CRM receipt. The 19 November candidate review found the implementation can add an older triggering night to the latest three and include available height, weight and BMI. Shane and regional care/privacy owners still need to confirm the permitted payload and disclosure, queue and repeat-request handling, working-day definition, ownership, hours, fallback, production access and signed app-to-care evidence. 2 November care transcript · 3 November engineering transcript · 4 November transcript · EAS-87 · EAS-125.
- 5–18 November · Closed beta first (D-08, D-11, D-13). The 5 November discussion kept beta on staging and routed changes through product review. Raena and Shane agreed on 10 November to start closed and reconsider as readiness improved. The earlier 11 and 16 November targets are historical. On 17 November, the team targeted staff distribution for 20 November subject to Shane confirming the build and access. The Raena follow-up distinguished internal store submissions from public review and discussed January as a public soft-launch target. The landing-page beta signup versus direct store link remains open. Management go/no-go, store acceptance and whether IMDA will accept beta evidence are still open. Raena will seek IMDA confirmation. 5 November Teams transcript · 10 November Teams transcript · 17 November copy and beta transcript · Raena follow-up transcript.
- 16 November · Hold scoring changes pending broader feedback (D-02, D-03, D-19). The team agreed to capture and respond to Gary's feedback before revising algorithms or thresholds. Tests across a wider cohort will inform changes. A clearer no-pauses state and changes to cross-device comparisons were suggestions. The approved provisional formula and its calibration status are recorded in the 11 November checkpoint below. 16 November Teams transcript.
- 17 November · Wellness positioning and copy review (D-03, D-07, D-18, D-23). Daniel reported management endorsement of the two positioning points discussed that morning: advanced snoring analysis and human support from a dedicated sleep-care coordinator. The team used wellness wording as its working direction for marketing. The proposed softer wording for breathing pauses was drafting guidance. The afternoon team agreed to retain “breathing pauses” in the beta app pending legal feedback. Kedar will consolidate the copy inventory and Daniel will review terminology. Formal review remains open for claims, care escalation, terms and privacy. The management endorsement reported in the meeting does not establish approval of final wording or clearance of the Snoraire name. Morning USP and legal transcript · Afternoon beta copy transcript.
- 18 November · Analytics and session replay consent (D-07, D-20). The 16 November discussion left the choice open. Shane's later decision requires one optional switch in onboarding and Profile, off by default. Both analytics and replay start after opt-in and stop on withdrawal. An earlier default-on state does not count as consent. Exact-build signed-device, privacy disclosure and store acceptance checks remain open. EAS-35 and consent decision.
- 17–19 November · Handover and cost plan (D-10, D-16, D-30). The internal retro discussed closing the project after IMDA review. The Raena follow-up discussed a mid-to-late December exit subject to store readiness, an interim Jonas handover and a future PM appointment. The receiving owner, date and acceptance remain open. Shane agreed to send Gary the running-cost breakdown by user tier, timeline and blockers by 20 November. The meeting estimate is planning input. The acquisition code discussed still needed installed-device and production verification. 17 November retrospective transcript · Raena follow-up transcript.
Atenvia
- Current engagement · Discovery and planning. The agreed working scope covers workshops, product and technical discovery, and planning. Technical discovery leads. Easmed owns funding and appointment of any future build team. The 29 October discussion on one Löwenstein integration, architecture ownership and Zoho medical-data boundaries, and the 11 November discussion on clinic workflows, were discovery inputs. The 11 November internal kickoff agreed to seek stakeholder sign-off on vision, problem, users and success before design. Clinic-scoped access, dashboards and clinical records were candidate scope. Earlier build/go-live/grant dates and the possible Ashwin quote remain historical planning inputs. 29 October Teams transcript · 11 November kickoff transcript excerpt · Current Atenvia plan.
- 17 November · Engagement options open. Audrey plans to present three options to Easmed on 26 November, 2–3 pm Singapore time, with Shane and Kedar expected to join, subject to calendar confirmation. The transcript records internal preparation. Client selection, the decision owner, the build appointment and the applicable grant obligations remain open. 17 November retrospective transcript · EAS-89 · EAS-16.
The review used verbatim transcripts in SharePoint and Granola's desktop app. The 11 November Atenvia kickoff archive contains an excerpt. Some Teams exports collapse speaker labels, so the log attributes choices to named individuals only when the dialogue identifies them. Notion decision timeline · Full decision register · Decision workbook · Portal decision timeline.
Earlier working decisions include Gary's 29 October direction for a consistent care CTA and a light-touch request, the 4 November proposals for assigning nights across midnight and handling short or multiple recordings, and the 5 November marketing call's decision to hide the website Share CTA for beta. Those discussions inform the detailed requirements and later review. 29 October care transcript · 4 November engineering transcript · 5 November marketing transcript.
11 November 2026 checkpoint · Historical
Version: 2026-11-11-decision-checkpoint-v1. This brings the decision timeline into line with the existing owner confirmations and the last recorded beta assessment. It records no new product approval or provider verification.
Confirmed product choices
- D-01 — Password sign-in is approved. Jonas and Shane made the choice; Shane confirmed it on 2 November. The exact original decision date was not supplied. Registration, verification, recovery, sessions and protected backend ownership still need acceptance evidence.
- D-02 — The provisional snore formula is approved, with testing and tuning ongoing. Shane confirmed approval in the prior week’s meeting with Ervin; the exact meeting date was not supplied. Jonas owns testing and reporting back. Category bands, clinical validation and release acceptance remain separate.
- D-28 — Night Notes / Morning and Bedtime check-ins are included in MVP. Shane confirmed the earlier approval on 2 November; the original meeting date and approver were not supplied. Catalog, optionality, session grouping and save/reload evidence remain open. Journal inputs stay separate from scoring.
- D-29 — The bedtime reminder is included in MVP. The same confirmation and date limits apply. Default/editable time, opt-out, permissions, timezone/DST and actual delivery remain to be verified.
The approved provisional formula remains:
Score = 100 × sqrt(clamp(Pw, 0, 82.5) / 82.5)
Pw = 100 × sum(episode duration × mean snore weight) / recorded audio time
Relative weights = 1.0 / 1.1 / 1.2
Latest beta assessment — 8 November 2026
Hold beta invitations. Under 2026-11-08-beta-release-preflight-v5, four preparation gates are complete, store distribution is partial and six other gates remain unfinished. Android 0.1.10/26 was submitted to Play internal. iPhone 0.1.10/32 is valid and in internal TestFlight testing. Play track availability, approved tester access and physical installation remain unverified at this checkpoint.
The seven unfinished gates cover security/release configuration, migration/recovery, store distribution, installed-candidate/overnight acceptance, SG/MY care/CRM, legal/support/store material and operations/final go/no-go. Shane owns deployment and DevSecOps; Jonas supports application/build defects. The release checklist contains the remaining owners, dependencies and closure evidence. These release gates are separate from Play’s 11 initial Console setup tasks.
Decisions and evidence still open
Result categories and copy, regional CRM modules/mapping and receipt, callback payload/disclosure and response commitments, and legal/operational approval remain subject to their existing decision and acceptance records. D-07 privacy research was completed on 3 November; that output does not establish legal endorsement or implementation acceptance. No ticket is closed by this reconciliation.
The CSV retains 30 decision records; the focused workbook contains 22 product/engineering records. Their different scopes should not be read as missing decisions. Earlier timeline text is historical wherever it conflicts with the confirmations above. The checkpoint updates release evidence; it does not resolve product choices by inference.
Sources: Owner confirmations, CSV decision register, working workbook, beta checklist, privacy research, analytics checkpoint and draft PR #43.
Counterpart: Notion decision timeline. Portal: Decision log.
Notion timeline update saved and read back on 11 November 2026 with 2026-11-11-decision-checkpoint-v1; the four confirmed choices, unchanged formula, beta hold and retained TL-01/TL-28 history were checked. Ticket properties and generated dashboard snapshots were not changed. Rendered layout review remains blocked by the unavailable browser host.
Earlier reconciliation — historical where superseded
Latest decision reconciliation — 2 November 2026
Version: 2026-11-02-granola-refresh-v1. Current Excel decision log; source reconciliation and open decisions. The workbook contains the current review log, all 19 concerns, prior decision history and source evidence. The 29 October account/password and audio-only deletion discussions conflict with earlier proposed contracts. SG Deals versus Leads and API versus form wording also need confirmation. These are recorded conflicts, not approved requirement changes. November remains an invited technical beta; January is the broader launch direction. Final approvals and acceptance evidence remain pending.
Earlier dated content in this document is historical where it conflicts with the refresh. Notion alignment is pending access; no release, implementation or clinical/legal acceptance is established here.
Latest operating-model record · 27 October 2026
Version: 2026-10-27-completeness-v1. Completeness/evidence supplement; current decision register.
TL-28 · 26 October evening · responsibilities and decision mandate
Recorded internal agreement: Shane focuses on PM through Airese MVP launch; Jonas owns engineering. Shane prepares the freeze list and walkthrough with Jonas/Kedar, brings Maha/CCC deliverables into the plan and coordinates an Easmed-hosted Teams channel. Engineering capacity shortfalls go to Gary for resourcing. Earlier implementation assignments for Shane need reassignment or explicit reconfirmation.
Authority requiring confirmation: the note reports Ervin as final product authority, with formal delegation needed for Gary. Decision packs need options, trade-offs, recommendation and an agreed deadline; pause the affected item when no authorized decision arrives by that deadline. The 28 October review is the target to settle the freeze/mandate, not evidence that either is approved.
Recorded internal transition: Shane moves to Atenvia after Airese launches; Raena/Kedar run Airese post-launch with Jonas engineering. Raena/Kedar begin Atenvia discovery with Pam in parallel; formal kickoff follows Airese launch with Audrey attending. Client scope, dates, handover acceptance and ongoing support remain unconfirmed.
Authentication: Jonas owns the engineering trade-off. The note does not expressly revoke the daytime email OTP product baseline. Retain that baseline and document the alternative/rationale; do not infer regulatory approval from the discussion.
Source: 26 October evening operating-model meeting, freshly read via Granola on 27 October. Internal assignments are distinguished from client approval. The Notion counterpart was updated and read back on 27 October at 05:46 UTC; TL-27/TL-28, all ten register items and TL-01 through TL-26 were verified.
Latest direction · 26 October 2026 · 2026-10-26-signoff-v1
TL-27 · Email OTP accounts and Wednesday sign-off
Recorded decision: full email OTP accounts from V1 supersede TL-26’s accountless product direction. SMS verification moves to January; social login, magic link and second-phone sync are deferred. User-scoped API authorization and server-sync proof remain outstanding.
Proposed / open: weighted snore formula, separate breathing-highlight CTA, score/category bands, one-night trigger, six-hour usability versus two-hour cancellation, and deleted-audio analysis/waveform behaviour need screen-based review on Wednesday 28 October. Comparisons/trend refinement move to January. The 11 November target versus mid-November lock needs reconciliation. Existing device and scientific gates are not waived.
Source: 26 October minutes, supplied by Shane and checked against the shared Granola note in Comet. Gary / Ervin review; Kedar prepares screens, Shane presents trade-offs and Jonas supplies logic. Prior entries keep their original evidence and are historical where superseded.
Historical foundation · 23 October 2026 / draft v1
The original review covered ten detailed Granola notes dated 29 September–16 October and the local scope clarification on 23 October. TL-27 and TL-28 above add the later 26 October records; the current review version is 2026-10-27-completeness-v1.
This is a working decision history for review and further information. It records what the available notes say at each point in time; it does not turn proposals into approvals, prove implementation or override the current requirements. Historical owners are included only when the notes name them. Concerns remain shared across the team.
Notion counterpart: private working draft. Sharing permissions have not been expanded.
Source limits
The 27 October review freshly read ten accessible detailed notes, including the 26 October evening operating-model meeting. Its full source list and limitations are in the completeness supplement. The following paragraph describes the original 23 October discovery and is historical where superseded by the later review.
Verbatim transcripts are unavailable on the connected Granola plan. Meeting discovery is restricted to the last 30 days; the relevant available notes returned by discovery end on 16 October. This is a notes-based draft, not a verbatim transcript audit or complete meeting history. Earlier locally retained material has not been promoted into freshly verified Granola evidence. Granola history/access options.
Dates use the meeting date returned by Granola, rather than the last-edited date. “Recorded decision” means recorded in the meeting notes, not independently ratified by every required sponsor or clinical/legal approver. No speaker-level attribution or quotation is inferred from a summary.
Changes needing confirmation
| Topic | Recorded progression | What needs confirmation now |
|---|---|---|
| Account and identity | 5 Oct: account-first → 13 Oct: no login/logout → 23 Oct: accountless → 26 Oct: full email OTP accounts. | Retain email OTP; confirm account ownership, profile contract and server-sync evidence. The evening engineering discussion does not expressly replace the baseline. |
| Email verification and profile | 8 Oct: no verification → 13 Oct: mandatory verified email and more profile fields. | Confirm the current required fields, verification flow and data-minimisation rationale. |
| Night Notes | 8 Oct: include in Phase 1 → 13 Oct: defer from MVP → later local design/source includes notes. | Confirm whether it ships in V1 and which design/model is authoritative. |
| Recording duration and retention | 8 Oct: 12-hour stop; eight-hour default undecided → later concern reports an eight-hour hard cap. | Confirm the cap, sleep-chart semantics, audio retention and pruned-night display. |
| Callback and CRM | 6 Oct: external form → 13 Oct: prefilled handoff; 8/16 Oct distinguish country CRMs from future CCC routing. | Confirm destination/form, exact payload, consent, acknowledgement, regional ownership and fallback. |
| Score and report rules | Report categories recur, but final card count/copy and formula selection remain pending in the notes. | Confirm selected formulation, metric bands, comparison window, pattern rules and approvers. |
| Decision mandate and engineering ownership | 26 Oct evening: Shane focuses on PM; Jonas owns engineering; internal note reports Ervin holds final product authority. | Confirm Ervin’s mandate or Gary’s formal delegation, domain approvers and reassignment of earlier Shane implementation work. D-08; EAS-1/EAS-88/EAS-90. |
| Marketing, care and communication | 8 Oct: Maha FAQ and Shahira care-SOP assignments; 26 Oct: bring these deliverables into the roadmap and coordinate an Easmed-hosted Teams channel. | Confirm current completion, owner-accepted dates, approved assets/SOP, support staffing and channel location. D-09; EAS-90 and launch checklist. |
| Airese handover and Atenvia discovery | 26 Oct evening: internal choice is Airese continuity through launch, then Shane transitions to Atenvia; Raena/Kedar begin discovery with Pam in parallel. | Confirm client scope/dates, ongoing Airese support, accepted handover and formal kickoff after Airese launch. D-10; Atenvia draft spec and EAS-90. |
Current decision pack and approval record
The ten-item decision register holds the question/topic, options and trade-offs, recommendation and rationale, requested reviewer, review target/deadline provenance, affected requirements/tickets and acceptance evidence. Decision details explain the proposed product rules. Final choice, authorized approver, actual decision date and approved prototype/config version remain pending where no approval is evidenced.
The timeline preserves how the discussion changed; the register records the decisions we still need to settle. The 28 October review target does not establish an agreed deadline for every item. The Notion timeline counterpart is aligned for this supplement: saved readback verified TL-27/TL-28, the ten-item register, email OTP supersession and preserved historical entries on 27 October at 05:46 UTC. Other Notion counterparts have not been verified in this check. No ticket is closed by this documentation update.
Decision timeline
TL-01 · 2026-09-29 · Zoho access
At the meeting: Recorded decision.
Use a limited API connection for the initial Zoho query work, rather than requiring broad UI access.
Later context / confirmation needed: Connection details were handed over for testing; successful queries and production permissions were not proved by the meeting.
Source: Zoho One API setup and PostHog analytics integration.
TL-02 · 2026-09-29 · Analytics platform
At the meeting: Deferred decision.
PostHog versus the Zoho-included alternative remained undecided; dual reporting was proposed.
Later context / confirmation needed: Do not treat an alternative analytics platform or migration as approved.
Source: Zoho One API setup and PostHog analytics integration.
TL-03 · 2026-10-05 · Initial journey
At the meeting: Recorded decision.
Use account-first for the initial MVP and do not build two onboarding flows for an A/B test.
Later context / confirmation needed: Later notes on 13 October change the direction to no login/logout. Email verification was described as optional at this point.
Source: Easmed sleep app MVP design and onboarding flow with Kedar.
TL-04 · 2026-10-05 · Processing
At the meeting: Recorded constraint.
Require the app to be foregrounded for final processing in the initial version.
Later context / confirmation needed: The approximately 15-second discussion was an expectation, not a measured release promise. Later performance and recovery acceptance remain separate.
Source: Easmed sleep app MVP design and onboarding flow with Kedar.
TL-05 · 2026-10-05 · Scoring
At the meeting: Open decision.
Health score versus snore score still needed a product decision.
Later context / confirmation needed: No formula or score thresholds were selected in this note.
Source: Easmed sleep app MVP design and onboarding flow with Kedar.
TL-06 · 2026-10-06 · Data architecture
At the meeting: Recorded direction.
Process on-device; separate personal details from internal sleep-analysis data, with an identifier for permitted linkage. Keep sensitive health data out of Zoho unless its scope is agreed.
Later context / confirmation needed: This is a meeting design direction, not proof of de-identification, lawful handling or deployed data isolation.
Source: App deployment to AWS, data architecture, and customer handoff workflow.
TL-07 · 2026-10-06 · Callback handoff
At the meeting: Recorded direction.
Use an external Zoho form at the CTA; design responsibility was described as ending at that handoff.
Later context / confirmation needed: The 13 October notes move toward prefill/submission without user re-entry; reconcile which implementation is intended.
Source: App deployment to AWS, data architecture, and customer handoff workflow.
TL-08 · 2026-10-06 · Care dashboard
At the meeting: Future proposal.
Consider an internal care dashboard after collecting customer-care requirements.
Later context / confirmation needed: December/January was a discussion window, not an approved delivery date or MVP dependency.
Source: App deployment to AWS, data architecture, and customer handoff workflow.
TL-09 · 2026-10-08 · Delivery visibility
At the meeting: Recorded action.
Maintain a deliverable-level tracker across Airese and Atenvia and walk through it at DPT meetings.
Later context / confirmation needed: Shane was assigned the tracker and PRD follow-through. Hosting, scope freeze and sponsor sign-off still needed confirmation.
Source: Catchup on Easmed handover.
TL-10 · 2026-10-08 · Verification and contact
At the meeting: Recorded decision.
Remove email/phone verification from Phase 1; use phone as the primary callback contact and include Terms acceptance.
Later context / confirmation needed: The 13 October notes reintroduce verified email and a wider mandatory profile. Current requirements need reconciliation.
Source: Onboarding flow and recording details design with Kedar.
TL-11 · 2026-10-08 · Recording and results
At the meeting: Recorded decision.
Keep recording simple, allow screen lock, require foreground analysis, then open the report rather than Home.
Later context / confirmation needed: Auto-stop was described as 12 hours, with an eight-hour default still to consider. Processing copy of 5–15 seconds was not a benchmark.
Source: Onboarding flow and recording details design with Kedar.
TL-12 · 2026-10-08 · Report categories
At the meeting: Recorded design direction.
Use Ordinary, Unusual and Repeated pattern to guide escalating report messaging and care CTAs.
Later context / confirmation needed: The categories were a design direction; numerical cutoffs and pattern-confirmation rules were not approved by these notes.
Source: Onboarding flow and recording details design with Kedar.
TL-13 · 2026-10-08 · Night Notes
At the meeting: Recorded decision.
Retain Night Notes for Phase 1 as an engagement journal, separate from the score; reconsider its placement.
Later context / confirmation needed: This conflicts with the 13 October decision to defer it from MVP. Later local design/source includes it, so current scope needs confirmation.
Source: Onboarding flow and recording details design with Kedar.
TL-14 · 2026-10-08 · Notifications and local cleanup
At the meeting: Recorded decision.
Keep bedtime reminders; defer results-ready/stop reminders and automatic cleanup. Retain manual deletion.
Later context / confirmation needed: A fixed reminder time, final retention duration and full server/provider erasure were not settled here.
Source: Onboarding flow and recording details design with Kedar.
TL-15 · 2026-10-08 · Marketing and claims
At the meeting: Proposed positioning.
Discuss sleep screening rather than diagnosis, with sleep-companion positioning as an alternative. Verify AI and safe/danger-zone claims before publication.
Later context / confirmation needed: This is marketing direction, not regulatory classification or approval of store claims. FAQ, privacy and Terms remained preparation work.
Source: Marketing Launch Airese.
TL-16 · 2026-10-08 · Care data and minimum nights
At the meeting: Operational input.
Customer care requested contact/location, BMI and sleep context; approximately three nights were recommended before escalation.
Later context / confirmation needed: These are care-team inputs, not approved app thresholds, a final payload or permission to share health information.
Source: Airese app customer handoff workflow and CRM integration with Nur Shahira.
TL-17 · 2026-10-08 · SG/MY routing
At the meeting: Interim direction / proposal.
Singapore users were expected to remain with Singapore CS and Malaysia users with Malaysia CCC. Routing all leads to CCC with a country label was also proposed.
Later context / confirmation needed: The two descriptions must not be collapsed into one approved architecture. Shahira was assigned the app-lead SOP; regional access and attribution remained open.
Source: Airese app customer handoff workflow and CRM integration with Nur Shahira.
TL-18 · 2026-10-13 · Login and mandatory details
At the meeting: Recorded decision.
Remove login/logout for Phase 1, while requiring onboarding profile/contact fields and verified email. Defer phone verification.
Later context / confirmation needed: Changes the 5 October account-first direction and 8 October no-email-verification decision. Separate a consumer login screen from verified identity and backend access protection.
Source: Busy.
TL-19 · 2026-10-13 · Callback UX
At the meeting: Recorded decision.
Prefill from the profile and avoid user re-entry; send a callback request through Zoho and show a confirmation.
Later context / confirmation needed: Form access, data contract, delivery acknowledgement and country routing were not proved complete.
Source: Busy.
TL-20 · 2026-10-13 · MVP scope
At the meeting: Recorded decision.
Defer Night Notes until after MVP. Create separate stripped-down V1 and richer V2 design branches.
Later context / confirmation needed: The earlier inclusion and later local implementation/design are visible changes, not evidence of one continuous approved scope.
Source: Busy.
TL-21 · 2026-10-13 · Reports and copy
At the meeting: Direction with approval pending.
Put the dial/score first and use a short title, explanation and CTA. Three report categories remained the working model.
Later context / confirmation needed: Erwin’s final category/card-count feedback and Gary/Erwin copy sign-off were still required. Copy variants were proposed; no approved numerical rules follow.
Source: Busy.
TL-22 · 2026-10-13 · Score formulation
At the meeting: Recommendation / open decision.
Three formula options were available for Gary and Erwin to choose. Thirty-second sampling and a simple beta score were recommended.
Later context / confirmation needed: No chosen formula, approved bands or clinically validated threshold was established. The notes’ requested 21 October decision date is historical and not proof of approval.
Source: Busy.
TL-23 · 2026-10-13 · Release evidence
At the meeting: Recorded testing direction.
Separate staging/production data. Use automated flow checks and physical devices for recording/analysis.
Later context / confirmation needed: The then-discussed latest-device/latest-OS scope differs from the wider proposed resilience policy. The approved release matrix still needs confirmation.
Source: Busy.
TL-24 · 2026-10-13 · Success and scope
At the meeting: Open sponsor decision.
Define launch scope, accountable decision-makers and measurable success before treating the delivery target as an accepted contract.
Later context / confirmation needed: November Airese and February/Atenvia expectations were discussed; user/review benchmarks were examples, not adopted success metrics or firm launch commitments.
Source: Easmed MVP scope, success metrics, and delivery model with Audrey.
TL-25 · 2026-10-16 · Regional CRM architecture
At the meeting: Preferred interim direction.
Keep leads in the relevant country CRM for the November path, including Singapore leads in Singapore. Map the complete flow before deciding future middleware/CCC routing.
Later context / confirmation needed: A Malaysia-first future flow and dual-CRM staff access were discussed, not delivered or final approvals. CCC visibility after handoff remained unresolved.
Source: Multi-country CRM routing and data flow with Wei Jian.
TL-26 · 2026-10-23 · V1 data boundary
At the meeting: Local clarification / open design.
The local V1 scope note records an accountless consumer app, device-local audio/history, intended production database submissions and research R2 uploads.
Later context / confirmation needed: This entry comes from the local scope review, not Granola. Payload, identity/access protection, consent and erasure remain open; it does not approve an authentication bypass or ‘Nothing leaves your phone’.
Source: Local scope note: delivery/docs/airese/airese-recording-data-schema-review-2026-10-23.md.
Adding information
Add a dated entry rather than rewriting the original meeting record. Supply the topic, decision/proposal, who approved it if known, reason, source and which earlier entry it changes. Mark recollections as user clarification until a meeting/document source is available. An update can supersede a decision without deleting its history.
Suggested update format:
- Decision date:
- Topic / previous TL reference:
- Agreed change or clarification:
- Approver / decision authority:
- Reason and implications:
- Source / evidence:
- Status: proposed, recorded decision, confirmed, superseded, or still open.
Canonical local document: delivery/docs/airese/airese-decision-log-2026-10-23.md. Portal view: delivery/decision-log/index.html, local preview http://127.0.0.1:8771/decision-log/. Related shared concerns: delivery/launch/index.html. Existing Notion tickets, approved requirements and generated tracker snapshots are unchanged.